Please use this identifier to cite or link to this item: https://rep.vsu.by/handle/123456789/39698
Title: Обобщение теории и практики при проведении анализа безубыточности деятельности строительных организаций
Other Titles: Summary of the theory and practice in the analysis of break-even construction organizations
Authors: Капусто, А. В.
Костюкова, С. Н.
Kapusto, A.
Kostyukova, S.
Issue Date: 2014
Publisher: Полоцкий государственный университет имени Евфросинии Полоцкой
Citation: Капусто, А. В. Обобщение теории и практики при проведении анализа безубыточности деятельности строительных организаций / А. В. Капусто, С. Н. Костюкова // Вестник Полоцкого государственного университета. Сер. D, Экономические и юридические науки. – 2014. – №13. – С. 10–17.
Series/Report no.: Вестник Полоцкого государственного университета. Сер. D, Экономические и юридические науки;№ 13
Abstract: Обобщена теория анализа безубыточности, уточнено экономическое содержание понятий «точка безубыточности», «безубыточность деятельности промышленных и строительных организаций». Раскрыты этапы анализа безубыточности для организаций строительной отрасли. Разработана методика анализа безубыточности строительных организаций с учетом фактора времени, позволяющая планировать необходимое количество объектов строительства по их стоимости, которое обеспечит желаемую сумму прибыли; определять срок возмещения общепроизводственных расходов строительными участками и общехозяйственных расходов строительной организацией, по достижении которого организация начинает работать безубыточно; изучать влияние динамики объема строительно-монтажных работ на уровень безубыточности, затрат и прибыли предприятия; оценивать эффективность работы каждого участка в отдельности и организации в целом; выявлять наиболее прибыльные объекты; обосновывать целесообразность введения дополнительных объектов строительства. = The theory of break-even analysis is summarized and economic essence of the concepts such as “break-even point,” "break-even operation of industrial and construction organizations" is clarified. The break-even analysis stages applied to construction organizations are described. With taking into account the time factor, a technique of break-even analysis of construction organizations is developed. The technique allows to plan the number of construction projects which costs allow to earn the expected profit; to determine the period of overhead costs compensation at building sites as well as at the construction organization after what the organization reaches the break-even level of its activity; to investigate the impact of the dynamics of the construction work volume on the break-even point level as well as on costs and profits of the enterprise; to evaluate the performance of each site individually as well as the organization as a whole; to identify the most profitable objects; to reveal the expediency of additional construction projects.
URI: https://rep.vsu.by/handle/123456789/39698
ISSN: 2070-1632
Appears in Collections:Научные публикации (2014)




Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Ранжирование:
OpenAIRE
Индексирование:
OpenAIRE OpenDOAR base search roar worldcat core road road
Ресурсы наших партнёров:
Репозиторий Белорусского национального технического университета
Электронная библиотека Белорусского государственного университета
Электронная библиотека Гомельского государственного технического университета имени П.О.Сухого
Электронный архив библиотеки МГУ имени А.А. Кулешова
Репозиторий Полесского государственного университета
Электронная библиотека Полоцкого государственного университета
Научный репозиторий Могилевского института МВД Республики Беларусь